The ever increasing cost to ‘dispose of construction waste’ has reached an all-time high, placing additional pressures on building projects’ costs that are already being squeezed from a rise in materials and labour.

Construction companies are also facing pressure from the Government to drive down ‘greenhouse gas emissions’ in the built environment by 50% by 2025.

By engaging with us at the start ‘through early contractor involvement (ECI)’, we can provide an optimised earthworks solution that significantly reduces project costs, improves efficiency and has a positive effect on the environment.

Our dedicated earthworks engineers are equipped with ‘state-of-the-art’ surveying equipment and can carry out a topographical survey to map out the contours of the construction site.

The use of 3D modelling software enables us to produce ‘alternative’ earthworks modelling designs that maximise the quantity of excavated material retained on site, significantly reducing the amount of off-site disposal. As a consequence, health and safety and environmental benefits are also achieved through a reduction in lorry movements to and from the site.