The provision of 170 new 3-5 bed homes along with 8,500m2 of new section 38 highway – including adoptable and private drainage. The project also includes large scale earthworks for a new attenuation pond along with complex bridge & culvert works to maintain existing watercourses. We also applied soil stabilisation to a waterlogged and damaged area of the site. The solution delivered a durable, loadbearing haul road.
![bellway-homes-mallard-walk-stafford](https://www.mlambe.co.uk/wp-content/uploads/2020/01/bellway-homes-mallard-walk-stafford-1-750x500.jpg)
![bellway-homes-mallard-walk-stafford](https://www.mlambe.co.uk/wp-content/uploads/2020/01/bellway-homes-mallard-walk-stafford-6-426x500.jpg)
![bellway-homes-mallard-walk-stafford](https://www.mlambe.co.uk/wp-content/uploads/2020/01/bellway-homes-mallard-walk-stafford-7-351x500.jpg)
![bellway-homes-mallard-walk-stafford](https://www.mlambe.co.uk/wp-content/uploads/2020/01/bellway-homes-mallard-walk-stafford-2-750x500.jpg)
![bellway-homes-mallard-walk-stafford](https://www.mlambe.co.uk/wp-content/uploads/2020/01/bellway-homes-mallard-walk-stafford-4-750x500.jpg)
![bellway-homes-mallard-walk-stafford](https://www.mlambe.co.uk/wp-content/uploads/2020/01/bellway-homes-mallard-walk-stafford-5-750x500.jpg)